RFIs From the Coordinated Model: 7 Habits for MEP Trades to Get Faster Answers
How MEP trades write RFIs from the model that come back answered on the first pass.
How MEP trades write RFIs from the model that come back answered on the first pass.
California projects move fast, and your BIM partner affects cost, schedule, and field risk. The right firm turns site data, design intent, and trade input into models your crews build from. The wrong

How MEP trades turn a coordinated model into accurate insert and sleeve layout before concrete locks it in.
Seven checks to run on the model, the field, and the spool sheets before prefab goes to the shop.
How MEP trades capture installed conditions during the job, so the closeout record matches what sits behind the ceiling.
Set priority rules, work by zone, filter the report, and sign off in writing so your clash count drops every week.

A practical checklist for subcontractors who fabricate and install from a scanned model.

What LOD 300 and LOD 400 mean for MEP trades, and what to settle before you sign the scope.